ISLAY ST over MISSION CREEK

AT CASTILLO ST · County 083, California · Built 1982 · 2 Lanes · 700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
51C0289
Year Built
1982
Length
16.2 m (53.1 ft)
Max Span
9.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
700
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$312,000
Total Project Cost
$525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.