US HIGHWAY 101 NB over MISSION STREET

05-SB-101-R15.73-SB · County 083, California · Built 1963 · 3 Lanes · 60,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51 0210R
Year Built
1963
Reconstructed
1989
Length
38.6 m (126.6 ft)
Max Span
21.5 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
60,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.