MISSION ST over MISSION CREEK

WEST OF CASTILLO ST · County 083, California · Built 1963 · 5 Lanes · 18,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
51C0151
Year Built
1963
Reconstructed
1988
Length
9.7 m (31.8 ft)
Max Span
9.1 m
Width
22 m (72.2 ft)
Lanes
5
Daily Traffic
18,600
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.