DE LA VINA ST over MISSION CREEK
0.1 MI N ALAMAR AVE · County 083, California · Built 1916 · 3 Lanes · 11,250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
34.436467, -119.726044
This bridge is in worse condition than 96.2% of bridges in County 083. The average bridge in California is 0 years old; this one is 110 years old.
Nearby Bridges
ALAMAR AVE over MISSION CREEK
Built 1930
STATE ST over MISSION CREEK
Built 1950
TALLANT ROAD over MISSION CREEK
Built 1971
JUNIPERO STREET over MISSION CREEK
Built 1972
PUEBLO ST over MISSION CREEK
Built 1958
STATE ROUTE 225 over US HIGHWAY 101
Built 1957
STATE ROUTE 225 over UP RR & AMTRAK
Built 1984
MISSION ST over MISSION CREEK
Built 1963
MISSION CANYON RD over MISSION CREEK
Built 1891
US HIGHWAY 101 NB over MISSION STREET
Built 1963
Bridge Details
- Structure #
- 51C0244
- Year Built
- 1916
- Reconstructed
- 1926
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.1 m
- Width
- 33.5 m (109.9 ft)
- Lanes
- 3
- Daily Traffic
- 11,250
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $169,000
- Total Project Cost
- $579,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.