DE LA VINA ST over MISSION CREEK

0.1 MI N ALAMAR AVE · County 083, California · Built 1916 · 3 Lanes · 11,250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
51C0244
Year Built
1916
Reconstructed
1926
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
33.5 m (109.9 ft)
Lanes
3
Daily Traffic
11,250
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$169,000
Total Project Cost
$579,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.