STATE ST over MISSION CREEK

SE OF ALAMAR AVE · County 083, California · Built 1950 · 4 Lanes · 18,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
51C0133
Year Built
1950
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
23.3 m (76.4 ft)
Lanes
4
Daily Traffic
18,200
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.