Paraiso Dr over Channel
100 E of Pima Rd · County 013, Arizona · Built 2010 · 2 Lanes · 610 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.7, -111.894444
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 16 years old.
Nearby Bridges
Pinnacle Pk Rd over Drainage Way
Built 1986
Williams Dr over Channel
Built 1998
79th St over Wash
Built 1999
Miller Road over Rawhide Wash
Built 2022
Williams Dr over Wash
Built 1996
Miller Rd over Channel
Built 1996
Miller Road over Wash
Built 1997
Happy Valley Rd over Wash
Built 2006
Deer Valley Rd over Channel
Built 1998
Pinnacle Peak Rd over Rawhide Wash
Built 2009
Bridge Details
- Structure #
- 11273
- Year Built
- 2010
- Length
- 16.5 m (54.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 610
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.