Pinnacle Pk Rd over Drainage Way
0.25 mi W Pima Rd · County 013, Arizona · Built 1986 · 4 Lanes · 15,810 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.698722, -111.897306
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 40 years old.
Nearby Bridges
Paraiso Dr over Channel
Built 2010
79th St over Wash
Built 1999
Williams Dr over Channel
Built 1998
Miller Road over Rawhide Wash
Built 2022
Miller Rd over Channel
Built 1996
Williams Dr over Wash
Built 1996
Deer Valley Rd over Channel
Built 1998
Miller Road over Wash
Built 1997
Pinnacle Peak Rd over Rawhide Wash
Built 2009
Thompson Peak Pkwy over Talon Golf Path
Built 1997
Bridge Details
- Structure #
- 08873
- Year Built
- 1986
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 15,810
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.