Williams Dr over Wash
400 S of Pinnacle Peak · County 013, Arizona · Built 1996 · 2 Lanes · 810 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.708333, -111.916667
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 30 years old.
Nearby Bridges
Miller Road over Wash
Built 1997
Miller Road over Rawhide Wash
Built 2022
Pinnacle Peak Rd over Rawhide Wash
Built 2009
Williams Dr over Channel
Built 1998
79th St over Wash
Built 1999
Scottsdale Road over Wash Crossing
Built 2016
Miller Rd over Channel
Built 1996
Pinnacle Pk Rd over Drainage Way
Built 1986
Paraiso Dr over Channel
Built 2010
Deer Valley Rd over Channel
Built 1998
Bridge Details
- Structure #
- 11272
- Year Built
- 1996
- Length
- 11 m (36.1 ft)
- Max Span
- 3 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 2
- Daily Traffic
- 810
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.