79th St over Wash
E of E Williams Dr · County 013, Arizona · Built 1999 · 2 Lanes · 310 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.697222, -111.916667
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 27 years old.
Nearby Bridges
Williams Dr over Channel
Built 1998
Pinnacle Peak Rd over Rawhide Wash
Built 2009
Miller Rd over Channel
Built 1996
Scottsdale Road over Wash Crossing
Built 2016
Miller Road over Rawhide Wash
Built 2022
Williams Dr over Wash
Built 1996
Deer Valley Rd over Channel
Built 1998
Deer Valley Rd over Wash
Built 1999
Miller Road over Wash
Built 1997
Hayden Rd over Wash
Built 2004
Bridge Details
- Structure #
- 11270
- Year Built
- 1999
- Length
- 12.5 m (41 ft)
- Max Span
- 1.8 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 310
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.