Happy Valley Rd over Wash
250 E of 89th St · County 013, Arizona · Built 2006 · 4 Lanes · 15,400 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.722222, -111.891667
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 20 years old.
Nearby Bridges
Pima Road over Okie Laura Wash
Built 1983
Dynamite Bl over Wash
Built 1991
Dynamite Bl over Wash
Built 1991
Paraiso Dr over Channel
Built 2010
95th Street over Wash
Built 2008
Pinnacle Pk Rd over Drainage Way
Built 1986
Williams Dr over Wash
Built 1996
Miller Road over Wash
Built 1997
Miller Road over Rawhide Wash
Built 2022
Dynamite Bl over Wash
Built 1991
Bridge Details
- Structure #
- 11275
- Year Built
- 2006
- Length
- 16.5 m (54.1 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 15,400
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.