Paul Cleverdon over Trib to Baker Branch
.4MI. N. of CR. 32 · County 003, Alabama · Built 2024 · 2 Lanes · 77 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
30.479375, -87.717019
This bridge is in worse condition than 38.5% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 2 years old.
Nearby Bridges
CR-34S over E TRIB TO BAKER BRANCH
Built 2024
_Co.Rd34 over _Drainage Ditch
Built 2023
DAVIS ROAD over BAKER BRANCH
Built 2024
SR 59 over MAGNOLIA RIVER
Built 1936
CO RD 32 over Trib to Negro Creek
Built 2016
EAST SEVENTH ST over NEGRO CREEK
Built 1998
COUNTY ROAD 55 over BAKER BRANCH
Built 1995
CO RD 73 over Trib to Negro CR
Built 2016
CO. RD. 73 over NEGRO CREEK
Built 1996
CO RD 32 over Trib To Nergro Creek
Built 2016
Bridge Details
- Structure #
- 021638
- Year Built
- 2024
- Length
- 13.1 m (43 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 77
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $699,000
- Total Project Cost
- $769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.