_Co.Rd34 over _Drainage Ditch

_0.7 Mi. W of AL. HWY 59 · County 003, Alabama · Built 2023 · 2 Lanes · 277 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
021634
Year Built
2023
Length
7.6 m (24.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
277
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$384,000
Total Project Cost
$422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.