DAVIS ROAD over BAKER BRANCH
0.1 MI. N. OF CR32 · County 003, Alabama · Built 2024 · 2 Lanes · 276 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
30.473511, -87.725475
This bridge is in worse condition than 39% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 2 years old.
Nearby Bridges
_Co.Rd34 over _Drainage Ditch
Built 2023
CR-34S over E TRIB TO BAKER BRANCH
Built 2024
Paul Cleverdon over Trib to Baker Branch
Built 2024
COUNTY ROAD 55 over BAKER BRANCH
Built 1995
SR 59 over MAGNOLIA RIVER
Built 1936
CO RD 32 over Trib to Negro Creek
Built 2016
CO.RD.55 over POLECAT CREEK
Built 1983
EAST SEVENTH ST over NEGRO CREEK
Built 1998
CO RD 73 over Trib to Negro CR
Built 2016
COUNTY ROAD 24 over W PRONG OF MAGNOLIA RI.
Built 1995
Bridge Details
- Structure #
- 021632
- Year Built
- 2024
- Length
- 8 m (26.2 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Daily Traffic
- 276
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.