SR 59 over MAGNOLIA RIVER

2.7 MI N JCT US 98 · County 003, Alabama · Built 1936 · 5 Lanes · 25,479 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
012865
Year Built
1936
Reconstructed
1983
Length
10.1 m (33.1 ft)
Max Span
3 m
Lanes
5
Daily Traffic
25,479
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$842,000
Total Project Cost
$926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.