CR-34S over E TRIB TO BAKER BRANCH

0.5 MI. W. OF AL. HWY. 59 · County 003, Alabama · Built 2024 · 2 Lanes · 569 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
021633
Year Built
2024
Length
7.9 m (25.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
569
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$335,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.