COUNTY ROAD 55 over BAKER BRANCH
0.2 MI. N. OF CO. RD. 32 · County 003, Alabama · Built 1995 · 2 Lanes · 3,099 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.475725, -87.7508
This bridge is in worse condition than 44.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 31 years old.
Nearby Bridges
DAVIS ROAD over BAKER BRANCH
Built 2024
CO.RD.55 over POLECAT CREEK
Built 1983
_Co.Rd34 over _Drainage Ditch
Built 2023
CR-34S over E TRIB TO BAKER BRANCH
Built 2024
CO. RD. 55 over BRANCH OF POLECAT CREEK
Built 1994
Paul Cleverdon over Trib to Baker Branch
Built 2024
CR 55 over Unnamed Br.
Built 2017
CO.RD.9 over BRANCH
Built 1954
County Road 9 over Polecat Creek
Built 2019
COUNTY ROAD 24 over W PRONG OF MAGNOLIA RI.
Built 1995
Bridge Details
- Structure #
- 016190
- Year Built
- 1995
- Length
- 20.7 m (67.9 ft)
- Max Span
- 10.4 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,099
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $661,000
- Total Project Cost
- $727,000