US 90 EB over BLAKELEY RIVER

1.1 MI W AL 225 JCT · County 003, Alabama · Built 1997 · 2 Lanes · 11,394 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016304
Year Built
1997
Length
416.1 m (1365.2 ft)
Max Span
19.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
11,394
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,982,000
Total Project Cost
$13,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.