I-10 over JOES BRANCH

0.2 MI E US 90 · County 003, Alabama · Built 1969 · 14 Lanes · 63,162 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
009851
Year Built
1969
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Lanes
14
Daily Traffic
63,162
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,765,000
Total Project Cost
$8,542,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.