US 98 WB over DOLIVE CREEK

0.2 MI E JCT I-10 · County 003, Alabama · Built 1969 · 2 Lanes · 20,443 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
010042
Year Built
1969
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
20,443
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,140,000
Total Project Cost
$2,354,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.