I10 EB TO US 98EWB over US 98

I10 @ US98-DAPHNE · County 003, Alabama · Built 1978 · 2 Lanes · 10,794 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011929
Year Built
1978
Length
255.7 m (838.9 ft)
Max Span
19.8 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
10,794
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,734,000
Total Project Cost
$5,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.