US 90/98 WB over US 90/98 WB

0.3MI W SPANISH FORT HILL · County 003, Alabama · Built 2002 · 2 Lanes · 5,880 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
018008
Year Built
2002
Length
56.1 m (184.1 ft)
Max Span
23.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
5,880
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,913,000
Total Project Cost
$2,104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.