US 90 WB over APALACHEE RIVER

2.4 MI W SPANISH FT · County 003, Alabama · Built 1978 · 2 Lanes · 11,394 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011988
Year Built
1978
Length
495.3 m (1625 ft)
Max Span
19.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
11,394
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,264,000
Total Project Cost
$15,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.