US 90 EB over APALACHEE RIVER

3.3 MI E OF MOBILE CO LN · County 003, Alabama · Built 1997 · 2 Lanes · 11,394 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
016303
Year Built
1997
Length
495 m (1624 ft)
Max Span
19.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
11,394
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,595,000
Total Project Cost
$16,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.