US90 E/W TO 1-10WB over US 90

I10-US90 CHACALOOCHEE BAY · County 003, Alabama · Built 1978 · 1 Lanes · 2,871 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
011928
Year Built
1978
Length
345.9 m (1134.8 ft)
Max Span
19.8 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
2,871
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,405,000
Total Project Cost
$7,046,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.