IH 41/USH 45 NB-ZO over STH 100/MAYFAIR RD

2.3M N JCT IH 894 · County 079, Wisconsin · Built 2022 · 4 Lanes · 81,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B40087500000000
Year Built
2022
Length
270.4 m (887.1 ft)
Max Span
41.1 m
Width
24 m (78.7 ft)
Lanes
4
Daily Traffic
81,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.