IH41/USH 45 SB-ZOO over STH 100-MAYFAIR RD
2.7M S JCT STH 190 TO E · County 079, Wisconsin · Built 2022 · 4 Lanes · 81,500 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.055372, -88.047936
This bridge is in worse condition than 12.4% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 4 years old.
Nearby Bridges
IH 41/USH 45 NB-ZO over STH 100/MAYFAIR RD
Built 2022
IH RAMP IH 41/USH over LRD UNDERWOOD PKWY
Built 2022
IH 41/USH 45 NB-ZO over LRD NORTH AVE
Built 2022
IH 41/USH 45 SB-ZO over LRD W NORTH AVE
Built 2023
IH RAMP IH 41 SB T over LRD W NORTH AVE
Built 2023
LRD SWAN BLVD over IH 41/USH 45
Built 2013
LRD W MEINECKE AVE over IH 41-ZOO FREEWAY
Built 2021
LRD WATERTOWN PLAN over UNDERWOOD CREEK / CMSTPP
Built 1972
STH 100|MAYFAIR RD over CANADIAN PACIFIC KANSAS
Built 1972
LRD WATERTOWN PLAN over UNDERWOOD CREEK
Built 1972
Bridge Details
- Structure #
- B40087600000000
- Year Built
- 2022
- Length
- 267.4 m (877.3 ft)
- Max Span
- 41.1 m
- Width
- 24 m (78.7 ft)
- Lanes
- 4
- Daily Traffic
- 81,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,372,000
- Total Project Cost
- $5,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.