IH RAMP IH 41 SB T over LRD W NORTH AVE

AT NORTH AVE · County 079, Wisconsin · Built 2023 · 1 Lanes · 4,417 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
B40079200000000
Year Built
2023
Length
47.8 m (156.8 ft)
Max Span
25.6 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
4,417
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.