LRD NORTH AVE EAST over MENOMONEE RIVER
0.7M E JCT STH 100 · County 079, Wisconsin · Built 1934 · 4 Lanes · 18,300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
43.060292, -88.034989
This bridge is in worse condition than 95.9% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 92 years old.
Nearby Bridges
LRD NORTH AVE - WE over MENOMONEE RIVER
Built 1934
LRD SWAN BLVD over MENOMONEE RIVER
Built 1978
LRD SWAN BOULEVARD over WATERWAY
Built 2006
IH RAMP IH 41/USH over LRD UNDERWOOD PKWY
Built 2022
IH 41/USH 45 NB-ZO over STH 100/MAYFAIR RD
Built 2022
IH41/USH 45 SB-ZOO over STH 100-MAYFAIR RD
Built 2022
LRD SWAN BLVD over IH 41/USH 45
Built 2013
IH RAMP WATERTOWN over IH 41/USH 45
Built 2014
IH 41/USH 45 NB-ZO over LRD NORTH AVE
Built 2022
IH 41/USH 45 SB-ZO over LRD W NORTH AVE
Built 2023
Bridge Details
- Structure #
- B40099900000000
- Year Built
- 1934
- Length
- 20.4 m (66.9 ft)
- Max Span
- 19.2 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 18,300
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $398,000
- Total Project Cost
- $597,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.