LRD WATERTOWN PLAN over UNDERWOOD CREEK / CMSTPP
0.1 MI W JCT STH 100 · County 079, Wisconsin · Built 1972 · 2 Lanes · 5,550 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.045817, -88.049392
This bridge is in worse condition than 40.6% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 54 years old.
Nearby Bridges
STH 100|MAYFAIR RD over CANADIAN PACIFIC KANSAS
Built 1972
LRD WATERTOWN PLAN over UNDERWOOD CREEK
Built 1972
LRD N 115TH ST over UNDERWOOD CREEK
Built 1976
LRD SWAN BLVD over IH 41/USH 45
Built 2013
IH RAMP IH 41/USH over LRD WATERTOWN PLANK RD
Built 2014
IH RAMP WATERTOWN over LRD WATERTOWN PLANK RD
Built 2014
IH RAMP WATERTOWN over IH 41/USH 45
Built 2014
IH 41/USH 45 SB over LRD WATERTOWN PLANK ROAD
Built 2014
IH41/USH 45 SB-ZOO over STH 100-MAYFAIR RD
Built 2022
IH 41/USH 45 NB-ZO over STH 100/MAYFAIR RD
Built 2022
Bridge Details
- Structure #
- B40047100000000
- Year Built
- 1972
- Reconstructed
- 2017
- Length
- 150 m (492.1 ft)
- Max Span
- 39.3 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,550
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,464,000
- Total Project Cost
- $3,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.