LRD WATERTOWN PLAN over UNDERWOOD CREEK / CMSTPP

0.1 MI W JCT STH 100 · County 079, Wisconsin · Built 1972 · 2 Lanes · 5,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B40047100000000
Year Built
1972
Reconstructed
2017
Length
150 m (492.1 ft)
Max Span
39.3 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
5,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,464,000
Total Project Cost
$3,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.