PARK ACCESS ROAD over SNAKE RIVER

CHIEF TIMOTHY PARK · County 003, Washington · Built 1975 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
CEPNWWWA0LGRCTA
Year Built
1975
Length
91.4 m (299.9 ft)
Max Span
30.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$704,000
Total Project Cost
$1,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.