PARK ACCESS ROAD over SNAKE RIVER
CHIEF TIMOTHY PARK · County 003, Washington · Built 1975 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.414978, -117.195819
This bridge is in worse condition than 50% of bridges in County 003. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
US 12 over ALPOWA CR
Built 1975
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1973
STEPTOE CAN 9280 over STEPTOE CREEK
Built 2017
STEPTOE CNY 9280 over STEPTOE CREEK
Built 2023
ALPOWA CREEK RD over STEMBER CREEK
Built 1972
ALPOWA CREEK RD over ALPOWA CREEK
Built 1964
ALPOWA CREEK RD over ALPOWA CREEK
Built 1980
SR 128 over SNAKE RIVER
Built 1979
US 12 over STEMBER CR
Built 1964
13TH STREET over FLESHMAN WAY
Built 1997
Bridge Details
- Structure #
- CEPNWWWA0LGRCTA
- Year Built
- 1975
- Length
- 91.4 m (299.9 ft)
- Max Span
- 30.4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $704,000
- Total Project Cost
- $1,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.