US 12 over ALPOWA CR
3.0 E GARFIELD CO · County 003, Washington · Built 1975 · 2 Lanes · 3,159 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.411911, -117.2138
This bridge is in worse condition than 89.3% of bridges in County 003. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
PARK ACCESS ROAD over SNAKE RIVER
Built 1975
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1973
STEPTOE CAN 9280 over STEPTOE CREEK
Built 2017
STEPTOE CNY 9280 over STEPTOE CREEK
Built 2023
ALPOWA CREEK RD over ALPOWA CREEK
Built 1964
ALPOWA CREEK RD over STEMBER CREEK
Built 1972
ALPOWA CREEK RD over ALPOWA CREEK
Built 1980
US 12 over STEMBER CR
Built 1964
HOWELL GRADE RD over DAVIS CANYON
Built 1979
SR 128 over SNAKE RIVER
Built 1979
Bridge Details
- Structure #
- 0009660A0000000
- Year Built
- 1975
- Length
- 64.9 m (212.9 ft)
- Max Span
- 31.7 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 3,159
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,124,000
- Total Project Cost
- $4,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.