US 12 over STEMBER CR

27.8 E JCT SR 127 · County 023, Washington · Built 1964 · 3 Lanes · 2,936 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0007418A0000000
Year Built
1964
Reconstructed
1997
Length
29 m (95.1 ft)
Max Span
28 m
Width
13.1 m (43 ft)
Lanes
3
Daily Traffic
2,936
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$993,000
Total Project Cost
$1,986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.