HOWELL GRADE RD over DAVIS CANYON
1.42 MI NW SR 12 · County 023, Washington · Built 1979 · 2 Lanes · 95 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.45425, -117.335847
This bridge is in worse condition than 75.9% of bridges in County 023. The average bridge in Washington is 0 years old; this one is 47 years old.
Nearby Bridges
US 12 over STEMBER CR
Built 1964
ALPOWA CREEK RD over STEMBER CREEK
Built 1972
ALPOWA CREEK RD over ALPOWA CREEK
Built 1964
ALPOWA CREEK RD over ALPOWA CREEK
Built 1980
KIRBY-MAYVIEW over SO DEADMAN CREEK
Built 1957
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1973
WAWAWAI/9000 over UNNAMED DRAINAGE
Built 1972
COLFAX AIRPRT/8010 over REBEL FLAT CREEK
Built 2013
US 12 over ALPOWA CR
Built 1975
STEPTOE CAN 9280 over STEPTOE CREEK
Built 2017
Bridge Details
- Structure #
- 080617000000000
- Year Built
- 1979
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.9 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 95
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.