SR 128 over SNAKE RIVER

0.2 E JCT US 12 · County 003, Washington · Built 1979 · 2 Lanes · 5,160 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0010850A0000000
Year Built
1979
Length
442 m (1450.1 ft)
Max Span
128 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
5,160
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,709,000
Total Project Cost
$23,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.