13TH STREET over FLESHMAN WAY

0.1 MI NO OF 16TH AVE · County 003, Washington · Built 1997 · 3 Lanes · 6,167 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
086321000000000
Year Built
1997
Length
40.8 m (133.9 ft)
Max Span
39.3 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
6,167
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,464,000
Total Project Cost
$2,928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.