FLESHMAN WAY over STATE ROUTE 129

JCT SR 129 · County 003, Washington · Built 1982 · 4 Lanes · 17,789 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
083763000000000
Year Built
1982
Length
30.2 m (99.1 ft)
Max Span
27.4 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
17,789
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,740,000
Total Project Cost
$3,480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.