SYLVESTER ROAD SW over FOX CREEK
0.7 S SW 160TH · County 033, Washington · Built 2012 · 2 Lanes · 2,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.451403, -122.348789
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 14 years old.
Nearby Bridges
SR 509 over SO 168TH ST
Built 1979
SR 509 over DES MOINES MEMORIAL
Built 1979
SO 160TH ST over SR 509
Built 1971
S 156TH ST over SR 509
Built 1970
SO 152ND ST over SR 509
Built 1971
S 156TH WAY over MILLER CREEK
Built 2005
SR 509 over SR 509/DES MOINES MEM
Built 1979
SR 518 over SR 509
Built 1971
SO 146TH ST over SR 509
Built 1970
SR 518 EB OFF RAMP over 8TH AVE
Built 2018
Bridge Details
- Structure #
- 088466000000000
- Year Built
- 2012
- Length
- 68.6 m (225.1 ft)
- Max Span
- 67.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,242,000
- Total Project Cost
- $8,484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.