S 156TH ST over SR 509

6.5 N JCT SR 516 · County 033, Washington · Built 1970 · 3 Lanes · 8,754 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

47.463328, -122.331428

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
0008745B0000000
Year Built
1970
Length
74.1 m (243.1 ft)
Max Span
19.8 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
8,754
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,655,000
Total Project Cost
$5,310,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.