SO 152ND ST over SR 509

5.7 N JCT SR 516 · County 033, Washington · Built 1971 · 2 Lanes · 11,984 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.466939, -122.332364

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 55 years old.

Nearby Bridges

Bridge Details

Structure #
0008745C0000000
Year Built
1971
Length
68.3 m (224.1 ft)
Max Span
20.7 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
11,984
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,022,000
Total Project Cost
$4,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.