SO 146TH ST over SR 509

0.1 N JCT SR 518 · County 033, Washington · Built 1970 · 2 Lanes · 5,632 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.47235, -122.331094

This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
0008745D0000000
Year Built
1970
Length
90.2 m (295.9 ft)
Max Span
29 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
5,632
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,250,000
Total Project Cost
$4,499,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.