51ST AVE SOUTH over SOUTHCENTER BLVD
0.06 MI N SR-518 UC BR · County 033, Washington · Built 1996 · 2 Lanes · 4,180 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.465242, -122.270631
This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 30 years old.
Nearby Bridges
51ST AVE S over SR 518
Built 1966
S-W RAMP over SOUTHCENTER BLVD
Built 1965
I-5 over SOUTHCENTER BLVD
Built 1965
I-5 over SOUTHCENTER BLVD
Built 1965
I-5 NB HOV over SOUTHCENTER BLVD
Built 1996
E-N RAMP over SOUTHCENTER BLVD
Built 1965
RAMP I-5 TO I-405 over RAMP SR 518 TO I-5
Built 1966
I-405 over I-5
Built 1965
I-5 over I-405 NB / SR 518 EB
Built 1966
I-5 over I-405 NB / SR 518 EB
Built 1966
Bridge Details
- Structure #
- 086345000000000
- Year Built
- 1996
- Length
- 67.7 m (222.1 ft)
- Max Span
- 31.7 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,180
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,687,000
- Total Project Cost
- $3,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.