51ST AVE S over SR 518
1.0 E JCT SR 99 · County 033, Washington · Built 1966 · 2 Lanes · 8,894 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.463433, -122.270556
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
51ST AVE SOUTH over SOUTHCENTER BLVD
Built 1996
S-W RAMP over SOUTHCENTER BLVD
Built 1965
I-5 over SOUTHCENTER BLVD
Built 1965
I-5 over SOUTHCENTER BLVD
Built 1965
RAMP I-5 TO I-405 over RAMP SR 518 TO I-5
Built 1966
I-5 NB HOV over SOUTHCENTER BLVD
Built 1996
E-N RAMP over SOUTHCENTER BLVD
Built 1965
I-405 over I-5
Built 1965
I-5 over I-405 NB / SR 518 EB
Built 1966
I-5 over I-405 NB / SR 518 EB
Built 1966
Bridge Details
- Structure #
- 0007401K0000000
- Year Built
- 1966
- Length
- 89.9 m (294.9 ft)
- Max Span
- 27.7 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 8,894
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,942,000
- Total Project Cost
- $5,885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.