I-5 NB HOV over SOUTHCENTER BLVD

JCT I-405 & SR 518 · County 033, Washington · Built 1996 · 2 Lanes · 6,898 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0014621C0000000
Year Built
1996
Length
39.6 m (129.9 ft)
Max Span
38.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
6,898
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$864,000
Total Project Cost
$1,729,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.