S-W RAMP over SOUTHCENTER BLVD
5.2 N JCT SR 516 · County 033, Washington · Built 1965 · 1 Lanes · 14,215 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.4651, -122.267208
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 61 years old.
Nearby Bridges
I-5 over SOUTHCENTER BLVD
Built 1965
I-5 over SOUTHCENTER BLVD
Built 1965
I-5 NB HOV over SOUTHCENTER BLVD
Built 1996
51ST AVE SOUTH over SOUTHCENTER BLVD
Built 1996
E-N RAMP over SOUTHCENTER BLVD
Built 1965
I-405 over I-5
Built 1965
RAMP I-5 TO I-405 over RAMP SR 518 TO I-5
Built 1966
51ST AVE S over SR 518
Built 1966
I-5 over I-405 NB / SR 518 EB
Built 1966
I-5 over I-405 NB / SR 518 EB
Built 1966
Bridge Details
- Structure #
- 0007442C0000000
- Year Built
- 1965
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.8 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 14,215
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $513,000
- Total Project Cost
- $1,026,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.