I-5 over I-405 NB / SR 518 EB
5.2 N JCT SR 516 · County 033, Washington · Built 1966 · 5 Lanes · 106,282 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.461417, -122.265125
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
I-5 HOV LANES over I-405 NB RAMPS
Built 1996
I-5 over I-405 NB / SR 518 EB
Built 1966
I-5 over E-N RAMP
Built 1965
N-W RAMP over I-405 E-N S-N RAMPS
Built 1966
RAMP I-5 TO I-405 over RAMP SR 518 TO I-5
Built 1966
E-N RAMP over SOUTHCENTER BLVD
Built 1965
I-405 over I-5
Built 1965
KLICKITAT DR over I-5
Built 1964
I-5 NB HOV over SOUTHCENTER BLVD
Built 1996
I-5 SB HOV over KLICKITAT DR
Built 1996
Bridge Details
- Structure #
- 0007401F0000000
- Year Built
- 1966
- Length
- 44.5 m (146 ft)
- Max Span
- 15.2 m
- Width
- 24.9 m (81.7 ft)
- Lanes
- 5
- Daily Traffic
- 106,282
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,260,000
- Total Project Cost
- $6,519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.