F RD NW over WEST CANAL
F NW .8 S Martin Rd · County 025, Washington · Built 1953 · 2 Lanes · 59 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.266331, -119.618789
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 73 years old.
Nearby Bridges
G RD NW over WEST CANAL
Built 1977
12 RD NW over WEST CANAL
Built 1994
Martin Rd over Lateral Canal
Built 2015
11.5 RD NW over WASTEWAY
Built 1953
H ROAD NW over WEST CANAL
Built 1949
SPILLWAY ACCESS over WINCHESTER WASTEWAY
Built 1948
Road 14.3 NW over WEST CANAL
Built 1999
SR 28 over WINCHESTER WASTEWAY
Built 1949
9 NW over Irrigation Lateral
Built 2024
DODSON ROAD over CANAL LATERAL
Built 1981
Bridge Details
- Structure #
- 079637000000000
- Year Built
- 1953
- Reconstructed
- 1991
- Length
- 27.7 m (90.9 ft)
- Max Span
- 9.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,823,000
- Total Project Cost
- $3,646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.