9 NW over Irrigation Lateral

.2 E of E NW · County 025, Washington · Built 2024 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.221139, -119.593528

This bridge is in worse condition than 12.2% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
089507000000000
Year Built
2024
Length
8.1 m (26.6 ft)
Max Span
8.1 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$659,000
Total Project Cost
$1,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.