DODSON ROAD over CANAL LATERAL
Dodson 1.3 N of 9 NW · County 025, Washington · Built 1981 · 2 Lanes · 1,567 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.241453, -119.554797
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
A-NW over W 22 CANAL
Built 2003
9 NW over Irrigation Lateral
Built 2024
9-NW over W 22 CANAL
Built 2003
12 RD NW over WEST CANAL
Built 1994
F RD NW over WEST CANAL
Built 1953
7 RD NW over IRR. CANAL
Built 2001
G RD NW over WEST CANAL
Built 1977
DODSON RD over LAT W20F BLK 89
Built 1993
Road 14.3 NW over WEST CANAL
Built 1999
SR 282 over GN RY
Built 1959
Bridge Details
- Structure #
- 081031000000000
- Year Built
- 1981
- Length
- 23.8 m (78.1 ft)
- Max Span
- 23.5 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,567
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,588,000
- Total Project Cost
- $3,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.