G RD NW over WEST CANAL
G NW 0.2 N of SR 28 · County 025, Washington · Built 1977 · 1 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.252058, -119.640136
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 49 years old.
Nearby Bridges
H ROAD NW over WEST CANAL
Built 1949
11.5 RD NW over WASTEWAY
Built 1953
F RD NW over WEST CANAL
Built 1953
Martin Rd over Lateral Canal
Built 2015
SPILLWAY ACCESS over WINCHESTER WASTEWAY
Built 1948
SR 28 over WINCHESTER WASTEWAY
Built 1949
J RD NW over WEST CANAL
Built 1949
9 NW over Irrigation Lateral
Built 2024
12 RD NW over WEST CANAL
Built 1994
Farm Access over West Canal W27 Lateral
Built 1998
Bridge Details
- Structure #
- 079646000000000
- Year Built
- 1977
- Length
- 30.8 m (101 ft)
- Max Span
- 30.8 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,371,000
- Total Project Cost
- $2,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.