G RD NW over WEST CANAL

G NW 0.2 N of SR 28 · County 025, Washington · Built 1977 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
079646000000000
Year Built
1977
Length
30.8 m (101 ft)
Max Span
30.8 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,371,000
Total Project Cost
$2,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.