SR 28 over WINCHESTER WASTEWAY
8.4 E JCT SR 281 · County 025, Washington · Built 1949 · 2 Lanes · 6,873 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.249328, -119.68525
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 77 years old.
Nearby Bridges
SPILLWAY ACCESS over WINCHESTER WASTEWAY
Built 1948
J RD NW over WEST CANAL
Built 1949
H ROAD NW over WEST CANAL
Built 1949
11.5 RD NW over WASTEWAY
Built 1953
Martin Rd over Lateral Canal
Built 2015
Farm Access over West Canal W27 Lateral
Built 1998
K RD NW over LAT. BL 73
Built 1999
K ROAD NW over LAT. BLK 73
Built 1952
G RD NW over WEST CANAL
Built 1977
9 NW over WINCHESTER WW
Built 1953
Bridge Details
- Structure #
- 000000LN0000000
- Year Built
- 1949
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.1 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 6,873
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $323,000
- Total Project Cost
- $646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.